Allen-Bradley MOX720-P4668E 80026-518-01 DC Switching Power Supply PowerFlex Series
Allen-Bradley

Allen-Bradley MOX720-P4668E 80026-518-01 DC Switching Power Supply PowerFlex Series

SKU: MOX720-P4668E 80026-518-01
Categories : All Products
In Stock
  • Dimensions: 22.5 x 23.8 x 7.5 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley MOX720-P4668E 80026-518-01, also cataloged as the MOX720-P4668E 80026-518-01, serves as a DC switching power supply unit utilized for regulated multi-output power distribution within PowerFlex drive control assemblies. The module processes 380-480 V AC three-phase input and converts it into stabilized DC supply rails for downstream electronic subsystems including control logic and auxiliary circuits.

Suffix Interpretation Scope

No validated factory-defined suffix decoding data is provided for MOX720-P4668E. The full catalog number shall be treated as a single identification string for maintenance and replacement traceability.

Hardware Specifications

Parameter Specification
Model MOX720-P4668E 80026-518-01
Brand Allen-Bradley
Origin USA
Weight 1.85 kg
Shipping Dimensions 22.5 x 23.8 x 7.5 cm
Operating Temp -25 deg C to +70 deg C
Storage Temp -40 deg C to +85 deg C
Input Voltage 380-480 V AC 3-phase
Input Frequency 47-63 Hz
Output Voltage 24 V DC (+/-0.5%)
Output Current 30 A continuous
Peak Current 35 A for 5 seconds
Output Power 720 W
Efficiency 94% typical
Power Architecture Multi-output DC switching (5 V / 15 V / 24 V rails)
Tariff Code 8537101190

Allen-Bradley Drive Power Distribution Characteristics

Within Allen-Bradley drive power architectures, the MOX720-P4668E implements controlled DC bus regulation and multi-rail distribution feeding logic-level circuits and I/O subsystems. Firmware-level coordination between power sequencing and drive controller initialization ensures deterministic startup behavior over EtherNet/IP based control networks. Backplane power stability directly influences module synchronization timing and control signal integrity during drive boot cycles.

Frequently Asked Questions

Q: Does the module support hot-swapping during operation?
A: Hot-swapping is not supported. Power isolation is required prior to removal or insertion.

Q: What is the backplane load behavior under full output condition?
A: The unit delivers up to 30 A continuous output across regulated rails; load distribution is internally managed by switching regulation stages.

Q: Can the module operate with single-phase input?
A: No. The unit requires 380-480 V AC three-phase input for nominal operation.

Q: What happens during peak load conditions?
A: The module supports short-term peak current of 35 A for up to 5 seconds before returning to continuous rating.

Q: Is firmware required for operation?
A: No standalone firmware is executed within the power supply; coordination is managed by the drive controller system.

Field Installation Guidelines

  • Ensure complete isolation of three-phase input before installation or removal.
  • Verify grounding continuity at chassis earth terminal before energization.
  • Maintain separation between power cabling and low-voltage control wiring.
  • Confirm correct phase sequence during input wiring connection.
  • Inspect connector seating alignment before applying mechanical fastening torque.
  • Avoid routing signal cables parallel to high-current DC output conductors.
  • Ensure ventilation clearance is maintained for thermal dissipation.
  • Perform insulation resistance check prior to system startup.

Ordering Info

  • MOX720-P4668E 80026-518-01 DC Switching Power Supply unit
  • Factory sealed packaging with anti-static shielding
  • Product identification label and traceability markings
  • Installation handling protection materials

No additional accessories are included unless specified in purchase order.

Delivery Information

Delivery time: 2-7 days when payment finish, shipped via DHL / FEDEX / UPS. Anti-static industrial packaging applied with reinforced shock protection layers for international transport handling stability.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Delica 10MW+ Wind Turbine Gearbox R&D and Manufacturing Project Breaks Ground in Wuxi
Nov 23, 2026
Maxwell
Delica 10MW+ Wind Turbine Gearbox R&D and Manufacturing Project Breaks Ground in Wuxi
Delica Transmission Technology (德力佳传动科技) has officially broken ground on a major manufacturing facility in Xishan...
Read More
China MIIT Issues New Regulations for AI Agent Terminal Devices Including Smartphones and Wearables
Nov 23, 2026
Maxwell
China MIIT Issues New Regulations for AI Agent Terminal Devices Including Smartphones and Wearables
China's Ministry of Industry and Information Technology (MIIT) has issued new regulatory guidelines governing AI...
Read More
Chery Announces Mass Production of Solid-State Battery with 1500km Range
Nov 22, 2026
Maxwell
Chery Announces Mass Production of Solid-State Battery with 1500km Range
Chery Automobile has announced plans to begin mass production of its Rhino S solid-state battery...
Read More
China's First Commercial Solar-Powered UAV 'Light Cavalry' Successfully Completes Maiden Flight
Nov 22, 2026
Maxwell
China's First Commercial Solar-Powered UAV 'Light Cavalry' Successfully Completes Maiden Flight
China's aerospace industry achieved a significant milestone on November 11, 2026, as the "Light Cavalry"...
Read More
High-Altitude Wind Power Startup Linyi Yunchuan Completes Angel Round Financing for S4000 System
Nov 22, 2026
Maxwell
High-Altitude Wind Power Startup Linyi Yunchuan Completes Angel Round Financing for S4000 System
High-altitude wind power startup Linyi Yunchuan has successfully completed its angel round financing series, securing...
Read More
RWE and KKR Finalize $16 Billion Investment in UK Offshore Wind Projects
Nov 21, 2026
Maxwell
RWE and KKR Finalize $16 Billion Investment in UK Offshore Wind Projects
The United Kingdom's offshore wind sector received a monumental boost on November 11, 2026, as...
Read More
Logistics and Automation Madrid 2026 Opens with 420 Exhibitors and 12,200 Visitors
Nov 21, 2026
Maxwell
Logistics and Automation Madrid 2026 Opens with 420 Exhibitors and 12,200 Visitors
The Logistics & Automation Madrid 2026 exhibition opened on November 11 at IFEMA Madrid, bringing...
Read More
SpaceX Starship Booster 22 Moved to Launch Pad for 15th Test Flight with Full Rocket Recovery Attempt
Nov 21, 2026
Maxwell
SpaceX Starship Booster 22 Moved to Launch Pad for 15th Test Flight with Full Rocket Recovery Att...
SpaceX has moved Super Heavy Booster 22 to the launch pad at Starbase, Texas, in...
Read More
North American Robot Orders Surge 24.8 Percent in Q3 2026 Led by Automotive and Semiconductor
Nov 20, 2026
Maxwell
North American Robot Orders Surge 24.8 Percent in Q3 2026 Led by Automotive and Semiconductor
North American robot orders increased 24.8 percent in the third quarter of 2026 compared to...
Read More
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Nov 20, 2026
Maxwell
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Hyundai Motor Group and Air Liquide have signed a memorandum of understanding to collaborate on...
Read More