Allen-Bradley 193-EEGE Electronic Overload Relay E1 Plus
Allen-Bradley 193-EEGE Electronic Overload Relay E1 Plus
Allen-Bradley 193-EEGE Electronic Overload Relay E1 Plus
Allen-Bradley

Allen-Bradley 193-EEGE Electronic Overload Relay E1 Plus

SKU: 193-EEGE
Categories : All Products
In Stock
  • Dimensions: 12.2 x 10.7 x 3 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for thermal motor protection in motor control center applications, the Allen-Bradley 193-EEGE (193EEGE Electronic Overload Relay) provides direct physical execution of current monitoring and circuit interruption signals.

Model Matrix

  • 193-EEGE: Base catalog number for the E1 Plus series electronic overload relay.

  • Configuration: Integrated three-phase sensing with selectable trip class functionality.

Hardware Specifications

Parameter Specification
Model 193-EEGE
Brand Allen-Bradley
Origin USA
Weight 0.3 kg
Shipping Dimensions 12.2 x 10.7 x 3 cm
Current Range 18-90 A
Adjustment Ratio 5:1
kW Rating 11-45 kW at 415 V AC-3
Operating Temp Consult manufacturer datasheet for ambient limits
Power Consumption Low dissipation solid-state design

Industrial Control Integration

The 193-EEGE utilizes solid-state sensing to monitor current across three phases. Integration with industrial control networks relies on consistent I/O density scaling where the relay's auxiliary contacts (95-96 and 97-98) interface with PLC input cards. Firmware flash compatibility is governed by the E1 Plus internal logic architecture, ensuring that trip timing characteristics remain synchronized with the motor load profile. Deterministic fault reporting is achieved by wiring the N/C contact in series with the contactor coil, providing a fail-stop mechanism during phase loss or thermal overload events.

Ordering Information

  • 193-EEGE E1 Plus Electronic Overload Relay unit.

  • Documentation and hardware accessories are limited to the items explicitly listed; secondary mounting brackets for stand-alone DIN-rail application may be required based on physical configuration.

Field Installation Guidelines

  • Contactor Mounting: The unit is engineered for direct attachment to Bulletin 100-C30 through 100-C85 contactors.

  • Stand-alone Installation: When mounted independently of a contactor, use an approved terminal bracket for DIN-rail or panel surface installation.

  • Auxiliary Wiring: Ensure terminal connections for 95-96 (N/C trip) and 97-98 (N/O alarm) use appropriate wire gauges to avoid mechanical stress on the relay body.

  • Environmental Protection: Install within an enclosure meeting the required IP rating for the specific industrial environment to prevent ingress of conductive dust or moisture.

Frequently Asked Questions

  • Can the trip class be modified in the field? Yes, the E1 Plus provides selectable trip class settings via the front-facing adjustment interface.

  • How does the unit handle phase loss? It includes a 3-second phase-failure detection threshold to prevent motor overheating under unbalanced load conditions.

  • Is the relay compatible with non-Allen-Bradley contactors? Yes, it can be configured for stand-alone mounting if terminal compatibility is managed via external busbars.

  • What is the function of the N/O 97-98 contact? This contact is used to signal a fault condition to a remote monitoring system or PLC.

  • Does this relay support hot-swapping? No, power must be disconnected from the motor branch circuit before removal or adjustment to ensure operator safety.

  • Can the internal thermal model be reset remotely? Reset logic must be configured via the physical reset button or wired into a control loop based on local requirements.

  • What is the minimum current rating for operation? The relay is designed for a minimum full load current (FLC) of 18 A.

  • Are there specific torque requirements for terminals? Adhere strictly to the torque specifications provided in the product manual for power and control terminals to prevent loose connections.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Nov 20, 2026
Maxwell
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Hyundai Motor Group and Air Liquide have signed a memorandum of understanding to collaborate on...
Read More
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Nov 20, 2026
Maxwell
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Torus Energy Storage has been named Battery Manufacturer of the Year at the 2026 Battery...
Read More
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
Nov 18, 2026
Maxwell
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
The global industrial automation sector is witnessing a dramatic reshuffling of strategic alliances as SoftBank...
Read More
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
Nov 17, 2026
Maxwell
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
The global electric vehicle battery landscape has undergone a decisive shift. According to data released...
Read More
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Nov 17, 2026
Maxwell
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Honeywell has entered a new chapter. At the ninth China International Import Expo (CIIE), held...
Read More