Allen-Bradley 1785-L80C15 PLC-5/80 Controlnet Processor Module PLC5
Allen-Bradley 1785-L80C15 PLC-5/80 Controlnet Processor Module PLC5
Allen-Bradley 1785-L80C15 PLC-5/80 Controlnet Processor Module PLC5
Allen-Bradley

Allen-Bradley 1785-L80C15 PLC-5/80 Controlnet Processor Module PLC5

SKU: 1785-L80C15
Categories : All Products
In Stock
  • Dimensions: 4.8 x 16.5 x 26.8 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 1785-L80C15 serves as the primary 1785-L80C15 CPU Processor utilized to execute deterministic register logic and ControlNet network communication across PLC-5 platform architectures.

Model Identification Architecture

  • Product Family: PLC5
  • Product Model: 1785-L80C15
  • Spare Model: 1785L80C15
  • Series Name: PLC-5/80 Controlnet Phase 1.5
  • Country of Origin: USA
  • Place of Shipment: Xiamen, China

Hardware Specifications

Parameter Specification
Model 1785-L80C15
Brand Allen-Bradley
Origin USA
Weight 1.36 kg
Shipping Dimensions 4.8x16.5x26.8cm
Operating Temp 0 deg C to +60 deg C
Power Consumption 12.5W (5V DC at 2.5A)
Processor Speed 3.0 MHz
User Memory 96K words
Data Memory 32K words
Backplane Isolation 1500V AC
Storage Temperature -40 deg C to +85 deg C
Operating Humidity 5-95% non-condensing

Industrial Network & Bus Communication

Configured for high-speed industrial control systems, the controller manages deterministic network updates using integrated ControlNet interfaces. Backplane bus communication velocity and firmware flash compatibility rely on stable 5V DC power distribution. I/O density scaling supports complex rack topologies while maintaining strict loop update intervals governed by active network scheduling parameters.

Package Ordering Information

  • 1 x 1785-L80C15 PLC-5/80 ControlNet Processor Module
  • 1 x Factory compliance statement
  • 1 x Hardware configuration guide

Mechanical Installation Guidelines

  • Chassis Insertion Protocols:
    • Align module card edges carefully with backplane guide rails inside the PLC-5 chassis slot.
    • Push the module forward until top and bottom locking latches snap into secure physical engagement.
  • Power & Grounding Execution:
    • Verify backplane power supply capacity exceeds total current draw before energizing the rack.
    • Connect chassis safety ground studs directly to low-impedance copper earth ground bars.
  • Communication Cabling Rules:
    • Route ControlNet coaxial or fiber cables away from high-voltage AC motor lines to minimize interference.
    • Secure cable connectors tightly to maintain proper impedance matching across the network trunk.

Frequently Asked Questions

  • Q: What is the operating CPU clock speed of the 1785-L80C15 processor?

    A: The internal CPU operates at a fixed clock speed of 3.0 MHz to execute ladder logic instructions.

  • Q: How much total user memory capacity does this module provide?

    A: The controller features 96K words of allocated user memory along with 32K words of data memory.

  • Q: What are the electrical power supply requirements for this processor?

    A: The unit draws power from the chassis backplane at 5V DC with a current load rating of 2.5A.

  • Q: What level of electrical isolation does the backplane interface maintain?

    A: The internal isolation barrier is rated to withstand up to 1500V AC to protect against transient voltage spikes.

  • Q: Can this processor module be inserted or removed while backplane power is active?

    A: No, live hot-swapping is not supported on standard PLC-5 backplanes; power must be turned off prior to handling.

  • Q: What is the allowable operating temperature range for reliable execution?

    A: The module functions within an ambient temperature span of 0 deg C to +60 deg C inside ventilated enclosures.

  • Q: How is the module secured physically inside the industrial rack?

    A: Integrated top and bottom locking mechanisms anchor the printed circuit assembly firmly into the chassis frame.

  • Q: What humidity limits apply to the storage and operational environment?

    A: The unit tolerates relative humidity conditions ranging from 5% to 95% provided non-condensing standards are met.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Nov 20, 2026
Maxwell
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Hyundai Motor Group and Air Liquide have signed a memorandum of understanding to collaborate on...
Read More
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Nov 20, 2026
Maxwell
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Torus Energy Storage has been named Battery Manufacturer of the Year at the 2026 Battery...
Read More
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
Nov 18, 2026
Maxwell
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
The global industrial automation sector is witnessing a dramatic reshuffling of strategic alliances as SoftBank...
Read More
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
Nov 17, 2026
Maxwell
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
The global electric vehicle battery landscape has undergone a decisive shift. According to data released...
Read More
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Nov 17, 2026
Maxwell
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Honeywell has entered a new chapter. At the ninth China International Import Expo (CIIE), held...
Read More