ABB NKAS01-15 Termination Cable for Symphony INFI 90
ABB NKAS01-15 Termination Cable for Symphony INFI 90
ABB NKAS01-15 Termination Cable for Symphony INFI 90
ABB

ABB NKAS01-15 Termination Cable for Symphony INFI 90

SKU: NKAS01-15
Categories : ABB
In Stock
  • Dimensions: 33 x 15 x 4cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for signal and power loop propagation in Symphony and INFI 90 control architectures, the ABB NKAS01-15 (NKAS01-15 Termination Cable) provides direct physical electrical interface execution between Multi-Function Processor (MMU) modules and termination assemblies.

Model Suffix Specifications

The NKAS01-15 is a standard-length shielded interconnect assembly. The "15" suffix denotes a fixed length of 15 feet (4.57 meters). No variable sub-configurations exist for this part number, as it utilizes a uniform conductor gauge and connector termination standard required for INFI 90 system backplane compatibility.

Hardware Specifications

Parameter Specification
Model NKAS01-15
Brand ABB
Origin Sweden
Weight 2.3 kg
Shipping Dimensions 33 x 15 x 4 cm
Operating Temp -25 deg C to +80 deg C
Power Consumption Not applicable (Passive)
Current Rating 5 A
Voltage Rating 300 V AC/DC
Wire Gauge 22–24 AWG

Control System Performance

The cable utilizes backplane bus communication velocity standards consistent with Symphony INFI 90 hardware. The design incorporates shielding to minimize electromagnetic interference (EMI) and cross-talk, ensuring signal integrity across high-density I/O configurations. I/O density scaling remains compliant with standard INFI 90 specifications, as the cable impedance characteristics are matched to the MMU interface requirements, preventing signal attenuation or data corruption in long-run deployments.

Ordering Information

  • NKAS01-15 Termination Cable assembly

  • Integrated connector termination ends

  • Technical installation documentation

Installation Guidelines

  • Routing: Avoid running the cable parallel to high-voltage power lines or Variable Frequency Drive (VFD) output cables to maintain signal purity.

  • Bend Radius: Adhere to a minimum bend radius of 10 times the outer diameter to prevent internal conductor fatigue.

  • Connector Seating: Verify that all pins are aligned before insertion into the MMU or termination unit. Ensure the locking mechanism is fully secured to prevent vibration-induced loosening.

  • Shielding: Ensure the cable shield is bonded to the equipment chassis ground at the designated grounding terminal to maximize noise immunity.

Frequently Asked Questions

  • Q: Does this cable support hot-swapping?

    A: No. Disconnect all power sources from the MMU and termination unit before disconnecting the cable to avoid electrical shorts.

  • Q: What is the maximum current capacity?

    A: The cable is rated for a continuous current of 5 A; verify that the connected load does not exceed this limit.

  • Q: How do I verify cable integrity if communication errors occur?

    A: Use a digital multimeter to check for continuity on each conductor and ensure insulation resistance exceeds required system standards.

  • Q: Is this cable shielded?

    A: Yes, the cable features internal shielding to protect against electrical noise within the control cabinet environment.

  • Q: Can I shorten or extend the 15-foot length?

    A: Modifying the length alters the impedance and capacitance characteristics, which can lead to communication errors in Symphony systems.

  • Q: How does the operating temperature affect the cable?

    A: The insulation material is specified for -25 deg C to +80 deg C; exceeding these limits will cause embrittlement or degradation of the outer jacket.

  • Q: Are the connectors compatible with standard DB-style interfaces?

    A: The cable utilizes proprietary ABB INFI 90 system connectors; verify interface compatibility before attempting to connect to non-ABB hardware.

  • Q: Does the cable require routine maintenance?

    A: Inspect for physical damage or wear to the insulation jacket periodically, especially in areas subjected to vibration or mechanical movement.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Continental Resources and Mercuria Launch $4B Vaca Muerta Joint Venture
Sep 06, 2026
MaxWell
Continental Resources and Mercuria Launch $4B Vaca Muerta Joint Venture
In a strategic move to capitalize on South America's premier unconventional energy play, Continental Resources...
Read More
Weidmüller Secures Guinness World Record for Terminal Connection Speed
Sep 06, 2026
MaxWell
Weidmüller Secures Guinness World Record for Terminal Connection Speed
Industrial control panel manufacturing continues to face skilled labor shortages and tight project turnaround timelines,...
Read More
Helmerich & Payne Claims Top Position in First-Quarter US Land Drilling Rankings
Sep 06, 2026
MaxWell
Helmerich & Payne Claims Top Position in First-Quarter US Land Drilling Rankings
Data analytics firm Enverus has published its US land drilling contractor and operator performance rankings...
Read More
Industrial Skills Gap: System Integrators Bridge Software and Hands-On Field Engineering
Sep 05, 2026
MaxWell
Industrial Skills Gap: System Integrators Bridge Software and Hands-On Field Engineering
 Rapid digitalization across modern manufacturing has created a pronounced talent discrepancy among incoming control system...
Read More
Bridging the Gap: Aligning Academic Research with Real-World Process Control Needs
Sep 05, 2026
MaxWell
Bridging the Gap: Aligning Academic Research with Real-World Process Control Needs
The industrial automation sector continues to grapple with a long-standing challenge: bridging theoretical academic research...
Read More
Autonomous Operations in Process Manufacturing: Reality vs Industry Hype
Sep 05, 2026
MaxWell
Autonomous Operations in Process Manufacturing: Reality vs Industry Hype
The industrial manufacturing landscape is witnessing a growing divide between discrete assembly operations and complex...
Read More
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Sep 04, 2026
MaxWell
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Germany’s manufacturing framework is undergoing a structural pivot, balancing macroeconomic stagnation with targeted, high-capital deployments...
Read More
Emerson Unveils DeltaV v16.LTS DCS Architecture
Sep 04, 2026
MaxWell
Emerson Unveils DeltaV v16.LTS DCS Architecture
Modern industrial operations face mounting pressure to modernize their automation infrastructure while controlling lifecycle expenditures...
Read More
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Sep 04, 2026
MaxWell
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Industrial facilities are rapidly evolving into the primary engines of data generation across global enterprise...
Read More
Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More