ABB C86-94639 TUV Flame Scanner Sensor Module PCBA
ABB C86-94639 TUV Flame Scanner Sensor Module PCBA
ABB C86-94639 TUV Flame Scanner Sensor Module PCBA
ABB

ABB C86-94639 TUV Flame Scanner Sensor Module PCBA

SKU: C86-94639
Categories : ABB
In Stock
  • Dimensions: 7 x 24 x 13.2cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB C86-94639, also cataloged as the C86-94639 PCBA Sensor Module, operates as a dedicated hardware component for flame detection and signal processing within FlameScanner combustion monitoring systems. This module provides direct physical execution of optical-to-electrical signal conversion, filtering, and logic state reporting for safety-instrumented combustion loops.

Model Identification

The C86-94639 serves as the direct successor to the C86-94613 sensor module. It incorporates specific Front End Filter logic to identify flame frequency and intensity, utilizing the technical reference HTCT321019P0032 to define its operational parameters within the scanner housing assembly.

Hardware Specifications

Parameter Specification
Model C86-94639
Brand ABB
Origin United States
Weight 1.00 kg
Shipping Dimensions 10.0 x 10.0 x 5.0 cm
Operating Temp Industrial Standard
Power Consumption Application Dependent
Certification TUV Safety Certified

ABB Industrial Control & Drive Communication

The C86-94639 utilizes deterministic signal processing paths to ensure that combustion feedback is transmitted to the control panel within the required safety response time. Its architecture supports I/O density scaling within the scanner head, allowing for consistent signal acquisition regardless of fuel composition. The PCBA integrates high-speed logic gates that interface with the system backplane, ensuring that flame-out detection triggers the fail-safe state execution dictated by the master burner management system (BMS).

Ordering info

  • C86-94639 PCBA sensor module assembly.

  • TUV certification documentation.

  • Moisture-controlled, anti-static packaging.

Field Installation Guidelines

Handling

  • Apply standard Electrostatic Discharge (ESD) protocols when removing the PCBA from its protective packaging.

  • Avoid direct contact with the circuit board traces or sensor components to prevent contamination or mechanical damage.

Installation

  • Ensure the scanner housing is de-energized before module insertion.

  • Align the PCBA precisely with the internal connector pins of the FlameScanner housing to prevent pin deformation.

  • Tighten housing fasteners to established torque specifications to maintain environmental sealing.

Frequently Asked Questions

  • Q: Is the C86-94639 compatible with C86-94613 scanner housings?

    A: Yes, it is designed as a direct form-fit-function replacement. No mechanical or electrical modifications are required for the retrofit.

  • Q: What is the purpose of TUV certification?

    A: TUV certification confirms the module meets international safety standards for fail-safe performance in hazardous combustion monitoring environments.

  • Q: Can this module monitor multiple fuel types?

    A: Yes. The Front End Filter technology is adaptable to the specific spectral characteristics of various industrial fuels, including natural gas and fuel oil.

  • Q: Does the module support hot-swapping?

    A: No. Flame scanner modules must be installed with the power to the unit disconnected to prevent damage to the internal logic components.

  • Q: What indicates a module failure?

    A: Failure is indicated through the master Burner Management System (BMS) logic, which will register a loss of flame signal or a scanner health fault.

  • Q: Should I calibrate the sensor after installation?

    A: Standard practice requires a burner sensitivity test and signal threshold verification after any sensor replacement to ensure flame detection accuracy.

  • Q: How should the module be stored?

    A: Store the module in a dry, moisture-controlled environment within its original anti-static shielding to prevent oxidation of electronic contacts.

  • Q: Does the module require field programming?

    A: No. The C86-94639 is a plug-and-play assembly; logic configuration is handled via the master burner management control panel.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Nov 20, 2026
Maxwell
Hyundai and Air Liquide Sign Hydrogen Transportation Partnership at CIIE 2026
Hyundai Motor Group and Air Liquide have signed a memorandum of understanding to collaborate on...
Read More
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Nov 20, 2026
Maxwell
Torus Named Battery Manufacturer of the Year for GigaOne Energy Storage Factory
Torus Energy Storage has been named Battery Manufacturer of the Year at the 2026 Battery...
Read More
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
Nov 18, 2026
Maxwell
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
The global industrial automation sector is witnessing a dramatic reshuffling of strategic alliances as SoftBank...
Read More
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
Nov 17, 2026
Maxwell
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
The global electric vehicle battery landscape has undergone a decisive shift. According to data released...
Read More
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Nov 17, 2026
Maxwell
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Honeywell has entered a new chapter. At the ninth China International Import Expo (CIIE), held...
Read More