ABB 3HAC022279-002 Advant OCS 800xA Programming Controller
ABB 3HAC022279-002 Advant OCS 800xA Programming Controller
ABB 3HAC022279-002 Advant OCS 800xA Programming Controller
ABB

ABB 3HAC022279-002 Advant OCS 800xA Programming Controller

SKU: 3HAC022279-002
Categories : ABB
In Stock
  • Dimensions: 24 x 19 x 5.3 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The ABB 3HAC022279-002 is a high precision motion control unit and gearbox assembly designed to resolve torque transmission challenges in heavy duty robotic and automation systems. While integrated into the Advant OCS and 800xA ecosystems for logic synchronization, this unit specifically functions as the primary reduction gear for the IRB 660 industrial robot series. It solves the problem of maintaining exact positional accuracy under high load conditions by providing a stable mechanical interface for the robots first axis. As a direct successor to the legacy 001 revision, this unit offers enhanced durability and smoother rotational performance, ensuring that industrial automation cells remain operational with minimal mechanical backlash.

Essential Hardware Parameters

Feature Specification Details
Brand ABB
Model Number 3HAC022279-002
Component Category PLC Programming Controller and Gearbox
Robotic Compatibility IRB 660 Series
Axis Assignment Axis 1 (Base Rotation)
Mechanical Type RV400C-224.26 Reduction Gear
Actual Hardware Weight 175 kg
Shipping Weight 1.22 kg (Logic Module Only)
Physical Dimensions 520 x 520 x 235 mm
Packaging Dimensions 24 x 19 x 5.3 cm
Finish Industrial White Paint
Manufacturing Origin Sweden

Model Code Decomposition

The technical designation for the 3HAC022279-002 follows ABB’s standardized global identification system:

  • 3HAC: This prefix identifies the part as a specialized component within the ABB Robotics and Discrete Automation division.

  • 022279: The core numeric sequence represents the specific engineering design for the RV400C series reduction gears used in high payload robotic frames.

  • 002: Denotes the hardware revision level. This version replaces the 001 model, featuring updated internal tolerances and improved seal materials to prevent lubricant leakage during high speed cycles.

  • RV400C: Refers to the internal cycloidal gear geometry, which is designed for high torque density and extreme rigidity in industrial positioning tasks.

Installation Strategy and Wiring

To ensure the mechanical integrity and logic synchronization of the 3HAC022279-002, follow these professional protocols:

  • Mechanical Alignment: Use precision hoisting equipment to position the 175 kg gearbox onto the IRB 660 base. Ensure the mounting surface is clean and free of debris. Tighten the axis bolts in a star pattern to the specific Newton meter torque rating defined in the robot service manual.

  • Lubrication Management: The unit is shipped with a factory seal. Before operation, verify the oil level and ensure the vent plug is correctly oriented to prevent pressure buildup during thermal expansion.

  • Logic Integration: Connect the axis feedback cable to the 800xA control interface. Calibrate the axis zero position within the PLC Programming Controller software to synchronize the physical gearbox position with the digital twin in the Advant OCS environment.

  • Safety Interlocks: Ensure all emergency stop circuits and axis limit switches are tested post installation to prevent mechanical overtravel that could damage the gear teeth.

FAQ Frequently Asked Questions

Is the 3HAC022279-002 compatible with other robot models?

This specific part is optimized for the IRB 660 industrial robot. While it shares design similarities with other heavy payload robots, the gear ratio and mounting flange are specifically tuned for the IRB 660 axis 1 requirements.

How does this unit interface with the 800xA system?

While the gearbox is mechanical, the 3HAC022279-002 assembly includes the logic parameters necessary for the Advant OCS and 800xA controllers to manage motion profiles and error detection for the robotic cell.

What is the expected service life of this reduction gear?

Under standard operating conditions and following the prescribed lubrication schedule, these units are designed for tens of thousands of operational hours. Regular grease analysis is recommended to monitor for internal wear particles.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Nov 19, 2026
Maxwell
Schneider Electric Partners with NVIDIA and HPE to Deploy Edge AI at Industrial Sites
Schneider Electric has announced a strategic collaboration with NVIDIA and Hewlett Packard Enterprise to accelerate...
Read More
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
Nov 19, 2026
Maxwell
SpaceX Orders HJT Solar Cell Production Line from SINGULUS for Starmind AI Satellites
SpaceX has placed an order with German equipment manufacturer SINGULUS Technologies for a heterojunction (HJT)...
Read More
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Nov 19, 2026
Maxwell
Rockwell Automation Launches PanelView Pro High-Performance HMI for Modern Manufacturing
Rockwell Automation has unveiled PanelView Pro, a next-generation high-performance human-machine interface designed to meet the...
Read More
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
Nov 18, 2026
Maxwell
US EIA Forecasts Texas Solar Generation to Surpass Coal for First Time in 2026
A milestone in the American energy transition is approaching, and it is happening in the...
Read More
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Nov 18, 2026
Maxwell
Humanoid Robots Enter 3C Manufacturing as Longqi Deploys Zhiyuan G2 in Tablet Production
Humanoid robots have crossed a threshold from laboratory curiosity to production floor reality in the...
Read More
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
Nov 18, 2026
Maxwell
SoftBank and ABB Re-Enter Talks for Robotics Unit After China Blocked Initial Acquisition
The global industrial automation sector is witnessing a dramatic reshuffling of strategic alliances as SoftBank...
Read More
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
Nov 17, 2026
Maxwell
Chinese Battery Makers Capture 56.4 Percent of Overseas EV Battery Installations in 2026
The global electric vehicle battery landscape has undergone a decisive shift. According to data released...
Read More
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Nov 17, 2026
Maxwell
Honeywell Technology Debuts Forge Platform at CIIE 2026 Under New Brand Identity
Honeywell has entered a new chapter. At the ninth China International Import Expo (CIIE), held...
Read More
Siemens Signs Strategic Partnership with Nanjing for Smart Manufacturing Under 15th Five-Year Plan
Nov 17, 2026
Maxwell
Siemens Signs Strategic Partnership with Nanjing for Smart Manufacturing Under 15th Five-Year Plan
Siemens is deepening its roots in one of China's most important manufacturing hubs. On November...
Read More
Apple Unveils HALO Humanoid Robot Autonomous Control System with 91% Task Success Rate
Nov 16, 2026
Maxwell
Apple Unveils HALO Humanoid Robot Autonomous Control System with 91% Task Success Rate
Apple has entered the humanoid robotics race, albeit in characteristically understated fashion. On November 4,...
Read More