ABB 1KHL015545R0001 O4LE Control Board
ABB

ABB 1KHL015545R0001 O4LE Control Board

SKU: 1KHL015545R0001
Categories : ABB
In Stock
  • Dimensions: 18.5 x 6.5 x 12.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 1KHL015545R0001, also cataloged as the O4LE Control Board, operates as a dedicated hardware component for multi-protocol fieldbus communication processing and mixed-signal I/O execution within O4LE network architectures. Configured for direct physical data link interface routing, the board orchestrates field signals via embedded PROFIBUS DP, Modbus RTU, and DeviceNet protocols while managing localized analog inputs and optically isolated digital inputs.

Parametric Specifications

Parameter Specification
Model 1KHL015545R0001 O4LE
Brand ABB
Origin USA
Weight 0.5 kg
Shipping Dimensions 18.5 x 6.5 x 12.5 cm
Operating Temp 0 to +55 deg C
Storage Temp -40 to +70 deg C
Relative Humidity 5% to 95% non-condensing
Power Consumption Less than 5 W typical
Operating Voltage 24 VDC (+/- 10%)
Isolation Voltage 1500 VAC
Analog Inputs 2 channels
Digital Inputs 24 VDC, optically isolated
Relay Outputs 250 VAC / 30 VDC, 2 A
Communication Protocols PROFIBUS DP, Modbus RTU, DeviceNet
Tariff Code 8537101190

Deterministic Network Architecture and Firmware Execution

The controller relies on a dedicated processing core configured to handle high-velocity network transactions without interfering with baseline control logic tasks. The assembly requires exact firmware flash compatibility verification to maintain simultaneous protocol stacking over fieldbus nodes. This communication layer coordinates variables over the internal backplane bus communication velocity channels, enabling uniform I/O density scaling options across the physical node cluster. By synchronizing digital filter samples with the network master clock, the board guarantees deterministic latency response configurations under peak data line loads.

Packaging Manifest

  • 1 x ABB 1KHL015545R0001 O4LE Control Board

  • 3 x Terminal Block Headers (Pluggable Type)

  • 1 x Terminal Resistance Jumper Pack

On-Site Installation Protocols

  • Static Discharge Mitigation: Field technicians must remain connected to a verified earth ground terminal via an ESD protection strap before unpacking or handling the board.

  • Cabinet Environment Controls: Maintain vertical mounting inside an enclosure with free space parameters matching standard subrack profiles to restrict ambient temperature elevations above +55 deg C.

  • Cable Routing and Shielding: Fieldbus communication lines (PROFIBUS DP, Modbus RTU, and DeviceNet) must utilize specialized shielded twisted-pair cables. Ground the shield at the enclosure bulkhead entry point to block high-frequency electromagnetic interference. Analog input conductors must be segregated from relay output paths.

Logistics and Packaging Controls

  • Fulfillment Cycle: Orders are packaged and ready for dispatch within 2 to 7 days when payment finish processes complete.

  • Shipping Vectors: Consignments are systematically routed worldwide via heavy carriers, specifically DHL, FEDEX, or UPS.

  • Environmental Armoring: Modules are packed within sealed anti-static industrial packaging matrices, reinforced with high-density polyurethane shell inserts to neutralize multidirectional vibration forces during global transit.

Engineering FAQ

Q: Is this control board rated for hot-swap operations under active backplane bus configurations?

A: No. The board does not utilize staggered power trace profiles or dedicated inrush current suppression hardware. Live extraction or insertion while the 24 VDC supply rail is energized can induce backplane voltage spikes, leading to runtime logic corruption or physical damage to adjacent processors.

Q: How is the multi-protocol interface configured on the O4LE board?

A: Protocols (PROFIBUS DP, Modbus RTU, or DeviceNet) are assigned via onboard hardware switches or software parameters that must match the corresponding firmware flash compatibility profile. Only one fieldbus interface can operate as the primary host gateway channel concurrently.

Q: What are the specific electrical limits and protection ratings for the integrated digital input lines?

A: The digital inputs accept a nominal 24 VDC level and are protected by an internal 1500 VAC optical isolation barrier. This decoupling structure blocks transient surge propagation from the external loop into the internal logic core.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More