88FK05 GJR2393600R0100 ABB PROCONTROL P14 Remote Bus Coupling Module
88FK05 GJR2393600R0100 ABB PROCONTROL P14 Remote Bus Coupling Module
88FK05 GJR2393600R0100 ABB PROCONTROL P14 Remote Bus Coupling Module
ABB

88FK05 GJR2393600R0100 ABB PROCONTROL P14 Remote Bus Coupling Module

SKU: GJR239360R0100
Categories : ABB
In Stock
  • Dimensions: 24 x 19 x 5.3cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for high-speed network integration in PROCONTROL P14 platforms, the ABB 88FK05 GJR2393600R0100 (88FK05 Remote Bus Coupling Module) provides direct physical signal coupling between distributed remote bus and 88 bus segments.

Model Identifier Matrix

The 88FK05 (GJR2393600R0100) is a passive interface assembly. The model designation identifies the coupling circuitry geometry, and the GJR2393600R0100 part number signifies the standard hardware revision compatible with PROCONTROL P14 rack assemblies. No user-adjustable hardware sub-variants or programmable firmware logic gates are present.

Hardware Specifications

Parameter Specification
Model 88FK05 GJR2393600R0100
Brand ABB
Origin Sweden
Weight 1.22 kg
Shipping Dimensions 24.0 x 19.0 x 5.3 cm
Operating Temp Industrial Standard
Power Consumption Passive (None)
Interfaces PROCONTROL Remote Bus, 88 Bus

Control Network Interface Performance

The module supports backplane bus communication velocity and deterministic network synchronization required for PROCONTROL P14 operations. The hardware is designed for I/O density scaling by bridging branching network segments without the requirement for active power injection or firmware-dependent data processing. Signal integrity is maintained through passive termination paths, minimizing potential protocol conversion latencies and ensuring transparent data exchange across the remote bus. The architecture adheres to electromagnetic compatibility requirements for high-voltage industrial installation zones.

Ordering Information

  • 88FK05 GJR2393600R0100 Remote Bus Coupling Module

  • Technical documentation for PROCONTROL P14 integration

  • ESD-safe transport packaging

Field Installation Guidelines

  • Mounting: Install the module into the designated P14 rack slot; ensure the module seating force is sufficient to engage the backplane connector terminals.

  • Cabling: Use appropriate shielded bus cables for both the remote bus and 88 bus interfaces to maintain signal shielding integrity.

  • Termination: Verify that bus termination resistors are correctly configured as per the system network topology requirements to prevent signal reflections.

  • Grounding: Secure the module chassis to the rack grounding bus to maintain a continuous low-impedance path for EMI suppression.

  • Inspection: Examine all interface connector pins for mechanical deformation before insertion into the system rack.

Frequently Asked Questions

  • Q: Does the 88FK05 require an external power supply?

    A: No. The module features a passive operational design, eliminating the need for external power and reducing the potential for electronic failure.

  • Q: Is the 88FK05 hot-swappable during system operation?

    A: No. System network communication should be isolated or the specific rack segment deactivated before installing or removing the module to avoid bus disruption.

  • Q: What is the impact of the passive design on signal range?

    A: The passive design requires that the bus cable lengths adhere to standard system specifications to prevent attenuation and timing errors across the network.

  • Q: How are data packets processed by this module?

    A: The module functions as a passive coupling junction; it does not perform active data processing or packet buffering.

  • Q: Can this module be used in both remote bus and 88 bus configurations?

    A: Yes, it is equipped with interfaces for both, allowing it to act as a bridge hub between diverse P14 system network branches.

  • Q: What indicates that the module is not correctly coupled?

    A: Connection issues manifest as communication timeouts or data packet loss on the bus, visible through the system controller's network diagnostic interface.

  • Q: Is firmware maintenance required for this module?

    A: No. The passive hardware architecture does not contain firmware and is immune to software-related obsolescence or update requirements.

  • Q: What is the primary cause of communication failure on this module?

    A: Failure is usually attributed to poor cable termination, oxidized connector pins, or improper network termination at the end of the bus segment.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Sep 04, 2026
MaxWell
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Germany’s manufacturing framework is undergoing a structural pivot, balancing macroeconomic stagnation with targeted, high-capital deployments...
Read More
Emerson Unveils DeltaV v16.LTS DCS Architecture
Sep 04, 2026
MaxWell
Emerson Unveils DeltaV v16.LTS DCS Architecture
Modern industrial operations face mounting pressure to modernize their automation infrastructure while controlling lifecycle expenditures...
Read More
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Sep 04, 2026
MaxWell
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Industrial facilities are rapidly evolving into the primary engines of data generation across global enterprise...
Read More
Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Sep 03, 2026
Shopify API
Emerson Secures Automation Deal for Shell Prelude Floating LNG Facility
Few engineering achievements capture the imagination quite like Shell Prelude. Moored approximately 475 kilometers off...
Read More
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
Sep 03, 2026
Shopify API
Emerson Selected to Automate BP Shah Deniz Gas Compression Project
In the high-stakes world of offshore and onshore gas production, few projects carry the geopolitical...
Read More
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
Sep 03, 2026
Shopify API
ABB Unveils First Extension Pack for System 800xA with Web-Based Operations
The industrial automation landscape is shifting rapidly as manufacturers demand greater flexibility from their control...
Read More
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Sep 03, 2026
MaxWell
Critical Manufacturing to Demonstrate Intelligent MES Platform at SEMICON India 2026
Critical Manufacturing is preparing to demonstrate how manufacturers can use MES, industrial connectivity, manufacturing analytics and...
Read More
Automation Can Create a Hidden Single-Point-of-Failure Risk
Sep 03, 2026
MaxWell
Automation Can Create a Hidden Single-Point-of-Failure Risk
As factories become more automated, the biggest operational risk may not always be a failed...
Read More
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
Sep 02, 2026
MaxWell
Water Utilities Face Growing Cybersecurity Pressure as OT Risks Rise
The cybersecurity of water and wastewater infrastructure is drawing renewed attention across the industrial automation...
Read More