51202330-200 RAM Battery Charge Cable Honeywell Series 8 DCS
51202330-200 RAM Battery Charge Cable Honeywell Series 8 DCS
51202330-200 RAM Battery Charge Cable Honeywell Series 8 DCS
Honeywell

51202330-200 RAM Battery Charge Cable Honeywell Series 8 DCS

SKU: 51202330-200
Categories : All Products
In Stock
  • Dimensions: 26cm x 7cm x 2cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Product Overview

The Honeywell 51202330-200 is a specialized RAM battery charging cable designed for the Series 8 Distributed Control System (DCS) hardware family. This critical interconnect serves a vital role in system reliability by ensuring that the volatile memory (RAM) of the controller retains its configuration and application logic during power interruptions. By facilitating a stable charge path for the backup battery system, the 51202330-200 prevents data loss and ensures that the Series 8 controller can perform a warm start without needing a full program reload from the server. Its precision-molded connectors and high-grade conductive materials are specifically optimized for the low-current, high-stability requirements of industrial processor memory modules.

Hardware Specifications and Functional Parameters

  • Component Designation Battery RAM Charge Interconnect

  • Model Identifier 51202330-200

  • System Compatibility Honeywell Series 8 DCS / C300 Environments

  • Functionality Memory backup power maintenance and charging

  • Connector Integrity Gold-plated or high-conductivity contact surfaces

  • Insulation Class Industrial-grade thermal and chemical resistance

  • Installation Type Internal controller-to-battery assembly link

  • Net Weight 0.06kg

  • Physical Proportions 26cm x 7cm x 2cm

  • Manufacturing Origin USA

  • Tariff Code (HS) 8537101190

Industrial Deployment and Site Applications

The 51202330-200 is a standard requirement for mission-critical automation infrastructures in the petrochemical, power generation, and pharmaceutical sectors. In these environments, unplanned downtime due to memory corruption is a significant risk; this 0.06kg cable ensures that the Series 8 hardware maintains its "last known good" state even during cabinet-level power cycling or maintenance. Its slim profile and 26cm length are perfectly sized for the tight internal routing found in modern Series 8 I/O and controller cabinets. Maintenance engineers specify the 51202330-200 during periodic battery replacement cycles to ensure the physical link between the charger and the RAM module remains robust, as aging cables can develop high resistance that prevents proper backup charging. By following Honeywell's precision engineering standards, this cable minimizes the risk of cold-boot failures and ensures continuous operational longevity for the entire control network.

FAQ

Q: What is the primary purpose of the 51202330-200 cable?

A: It provides the electrical path required to charge the RAM backup battery and maintain memory power when the main system voltage is lost, preventing the controller from losing its programming.

Q: Is this cable compatible with legacy Series A or Series C hardware?

A: The 51202330-200 is specifically keyed and designed for the Series 8 hardware family. You should verify the part number against your legacy hardware documentation as connector types vary between Honeywell system generations.

Q: How do I know if the battery charge cable needs replacement?

A: If your DCS reports "Battery Low" or "RAM Backup Fault" despite a new battery being installed, it may indicate that the 51202330-200 has developed a fault or oxidized contacts that are preventing a full charge from reaching the module.

Q: Does the 0.06kg mass include the battery itself?

A: No, the 0.06kg weight applies only to the specialized cable assembly. The backup battery is a separate component that connects to this cable within the Series 8 controller assembly.

Q: Can this cable be used for standard Ethernet or data communication?

A: No, this is a dedicated power and charging link for internal memory support. It is not designed for data transmission or network communication protocols.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Nord Drivesystems Expands IE5+ Synchronous Motor Range with New 112 Frame Size
Jul 04, 2026
MaxWell
Nord Drivesystems Expands IE5+ Synchronous Motor Range with New 112 Frame Size
Nord Drivesystems has announced the expansion of its IE5+ synchronous motor series with the introduction of a...
Read More
Faulhaber Launches BXI Series to Advance High-Torque Precision Robotics
Jul 04, 2026
MaxWell
Faulhaber Launches BXI Series to Advance High-Torque Precision Robotics
Faulhaber has introduced its BXI Series, an integrated drive solution specifically engineered to meet the growing...
Read More
STMicroelectronics Advances AI-Driven Predictive Maintenance in Motor Control
Jul 04, 2026
MaxWell
STMicroelectronics Advances AI-Driven Predictive Maintenance in Motor Control
STMicroelectronics has launched the FP-IND-MCAI1, a specialized AI-enhanced software package tailored for the EVLSPIN32G4-ACT evaluation platform. This...
Read More
Universal Robots Unveils UR AI Trainer for Force-Aware Robotic Learning
Jul 04, 2026
MaxWell
Universal Robots Unveils UR AI Trainer for Force-Aware Robotic Learning
Universal Robots has officially launched the UR AI Trainer, a specialized platform designed to bridge the...
Read More
LogiMAT 2026 Preview: Advancing Intralogistics Through Robotic Interoperability and Smart Sensing
Jul 04, 2026
MaxWell
LogiMAT 2026 Preview: Advancing Intralogistics Through Robotic Interoperability and Smart Sensing
The upcoming LogiMAT 2026 exhibition in Stuttgart is set to serve as a launchpad for...
Read More
NVIDIA GTC 2026: Bridging the Gap Between Simulation and Real-World Robotics with Fanuc
Jul 04, 2026
MaxWell
NVIDIA GTC 2026: Bridging the Gap Between Simulation and Real-World Robotics with Fanuc
NVIDIA’s latest ecosystem advancements at GTC 2026 mark a decisive pivot from experimental AI to industrial-scale robotic...
Read More
Autonics Launches AiC-MT Closed-Loop Stepper System for Precision Control
Jul 03, 2026
MaxWell
Autonics Launches AiC-MT Closed-Loop Stepper System for Precision Control
In the evolving landscape of industrial motion control, the traditional divide between low-cost, open-loop stepper...
Read More
Yaskawa Motoman Showcases AI-Powered Adaptive Robotics at MODEX 2026
Jul 03, 2026
MaxWell
Yaskawa Motoman Showcases AI-Powered Adaptive Robotics at MODEX 2026
The narrative of industrial automation is undergoing a fundamental shift from deterministic repetition to dynamic...
Read More
ABB Launches 500 X pH/ORP Sensor for Extreme Industrial Environments
Jul 03, 2026
MaxWell
ABB Launches 500 X pH/ORP Sensor for Extreme Industrial Environments
In the challenging world of process automation, sensor reliability is often a more significant bottleneck...
Read More
Banner Engineering Adds IO-Link to QM30VT3 for Advanced Edge Diagnostics
Jul 03, 2026
MaxWell
Banner Engineering Adds IO-Link to QM30VT3 for Advanced Edge Diagnostics
The evolution of predictive maintenance continues to shift toward the edge, with Banner Engineering recently...
Read More