3BHE004573R0145 UFC760BE145 ABB UNIGEAR Series Phase Modulator
3BHE004573R0145 UFC760BE145 ABB UNIGEAR Series Phase Modulator
3BHE004573R0145 UFC760BE145 ABB UNIGEAR Series Phase Modulator
ABB

3BHE004573R0145 UFC760BE145 ABB UNIGEAR Series Phase Modulator

SKU: 3BHE004573R0145
Categories : ABB
In Stock
  • Dimensions: 33 x 16 x 2 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 3BHE004573R0145, also cataloged as the UFC760BE145 Phase Modulator, operates as a dedicated hardware component for high-speed switching angle regulation and phase-angle modulation within UNIGEAR power electronic system platforms. The printed circuit board assembly translates control commands from the central processing core into precise gate timing adjustments, modulating the gating waveforms for downstream semiconductor stacks.

Component Design Matrix

The factory-assigned alphanumeric nomenclature identifies specific design revisions within the product lineage:

  • 3BHE004573R0145: Standard engineering catalog reference number for the printed circuit board assembly.

  • UFC760BE145: Functional hardware model configuration code denoting specific component populating criteria.

Technical Parameters Table

Parameter Specification
Model 3BHE004573R0145 (UFC760BE145)
Brand ABB
Origin Switzerland
Weight 0.36 kg
Shipping Dimensions 33.0 cm x 16.0 cm x 2.0 cm
Operating Temp 0 deg C to +60 deg C
Power Consumption Nominally supplied via the subrack internal backplane distribution network
Board Type PC Board Assembly
Signal Interface Multi-channel synchronous gate driving connections

Backplane Bus Communication Velocity and Firmware Flash Compatibility

The phase modulator board interfaces directly with internal processing chassis elements, relying on strict backplane bus communication velocity baselines to transmit real-time angular metrics without deterministic drift. Because any variation in signal processing latency disrupts phase balance across high-current networks, the module leverages integrated hardware timer registers to lock tracking intervals. Field deployment requires absolute confirmation of firmware flash compatibility across all connected communication nodes to prevent register mismatch state faults and ensure steady I/O density scaling profiles.

Engineering Support Registry

Q: Is this phase modulator assembly capable of hot-swap extraction under active line power?

A: No, online hot-swapping is not permitted. Drawing the card while the backplane bus communication velocity lines are active can cause severe voltage transients that damage the solid-state gate circuitry.

Q: How is logic registration monitored on this card layout?

A: The board features dedicated hardware interrupt flags that communicate runtime status directly to the main rack processor via internal register updates.

Q: What occurs during a failure of the phase reference input?

A: Onboard tracking logic detects the loss of synchronization pulses and forces all gating outputs into a safe, inhibited default state to safeguard the main switching elements.

Field Rigging and Integration Guide

  • Slide the card assembly precisely along the subrack guide tracks to avoid mechanical abrasion of the trace networks.

  • Ensure all faceplate grounding screws are fully tensioned to establish an optimal shielding boundary back to the metal chassis framework.

  • Isolate low-voltage gate signal cabling from parallel high-power AC lines within the internal layout ducts.

  • Implement strict electrostatic-discharge protection protocols, including grounded workspace mats, whenever handling the bare board structure.

Consignment Component Manifest

  • ABB 3BHE004573R0145 Phase Modulator Processing Card

  • Factory Parametric Test and Circuit Verification Certificate

Logistics and Dispatch Standards

Delivery time: 2-7 days when payment finish, with international shipping handled via premium networks including DHL, FEDEX, or UPS. The instrumentation card is vacuum-sealed in moisture-barrier anti-static industrial packaging sheets accompanied by custom shock-insulating foam padding to guarantee complete physical protection during global transport.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More