3300/12-02-22-00 Bently Nevada 3300 System Power Supply Module
3300/12-02-22-00 Bently Nevada 3300 System Power Supply Module
Bently Nevada

3300/12-02-22-00 Bently Nevada 3300 System Power Supply Module

SKU: 3300/12-02-22-00
Categories : All Products
In Stock
  • Dimensions: 5.1 cm x 20.3 cm x 33.0 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
Tags : 3300 System
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for power distribution in mechanical monitoring systems, the Bently Nevada 3300/12-02-22-00 (3300/12-02-22-00 Power Supply Module) provides direct physical and electrical execution for rack-mounted instrumentation.

Configuration Matrix

  • 3300/12: Base Model (Power Supply Module)
  • 02: Input Voltage (190-250 VAC, 50/60 Hz)
  • 22: Internal Safety Barrier configuration
  • 00: Not Required (Additional options)

Hardware Specifications

Parameter Specification
Model 3300/12-02-22-00
Brand Bently Nevada
Origin USA
Weight 0.38 kg
Shipping Dimensions 5.1 x 20.3 x 33.0 cm
Operating Temp 0 to +65 deg C
Storage Temp -40 to +85 deg C
Power Consumption 190-250 VAC Input
Humidity To 95% (non-condensing)

Mechanical Monitoring and TSI Integration

The 3300/12 power supply module ensures stable DC voltage rails for turbine supervisory instrumentation (TSI). In vibration monitoring racks, maintaining stable power is necessary to ensure eddy-current probe scaling remains within calibration limits. Voltage fluctuations or noise on the supply rail can lead to gap voltage validation errors, specifically causing deviations from the -10 VDC target. Robust internal filtering is provided to minimize noise propagation, ensuring that rotor dynamics data processed by the rack remains free from supply-induced artifacts.

Ordering Information

  • 1 x 3300/12-02-22-00 Power Supply Module

Field Installation Guidelines

  • Backplane Seating: Ensure the module is fully inserted and the latching mechanism is engaged to provide a secure connection to the backplane power bus.
  • Input Wiring: Verify that the AC input voltage matches the specific 190-250 VAC requirements before energizing the rack.
  • Ventilation: Maintain clear air passage above and below the module to allow for heat dissipation within the 3300 rack chassis.
  • Grounding: Connect the chassis ground terminal to a common earth ground to ensure personal safety and reduce electromagnetic interference.

Frequently Asked Questions

  • Is this module hot-swappable?

    The 3300/12 module supports hot-swapping; however, ensure the rack configuration is stable before removing or inserting the module during live operation.

  • What happens if the input voltage drops below 190 VAC?

    Operating below the rated input range may lead to output instability, trigger fault LEDs, or result in a complete shutdown of the monitored instrumentation.

  • Does this module provide redundancy?

    The 3300 system supports redundant power supply configurations; verify that your rack setup includes a secondary module if high availability is required.

  • How does the internal safety barrier function?

    The internal barrier limits the electrical energy delivered to the field sensors to prevent ignition in hazardous areas, as specified by the module configuration.

  • Can I use this for 110 VAC inputs?

    The -02 option is specified for 190-250 VAC. Using it with 110 VAC is outside the design parameters and will result in insufficient DC output.

  • What do the LED indicators on the front panel represent?

    LEDs indicate the status of the AC input, DC output health, and internal fault diagnostics. Refer to the system manual for specific blink codes.

  • What is the maximum load the module can support?

    The capacity is determined by the total number of modules installed in the rack; consult the system power budget spreadsheet for specific load limitations.

  • Is periodic calibration required for the power supply?

    No, the module is a fixed-output supply. Regular maintenance should focus on verifying input connections and ensuring the cooling path remains unobstructed.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Oct 21, 2026
Maxwell
Chengdu Hosts Embodied Intelligence Integration Conference for Automotive Manufacturing
Chengdu Economic and Technological Development Zone hosted a landmark conference on September 23, 2026, bringing...
Read More
OT cybersecurity network operations center
Oct 20, 2026
MaxWell
Industrial Cybersecurity Best Practices for OT Environments
Operational technology cybersecurity has evolved from an afterthought to a fundamental design requirement for industrial...
Read More
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
Oct 20, 2026
Maxwell
CRRC Showcases Wind Power Portfolio at WindEnergy Hamburg 2026
The global wind energy sector gathered in Hamburg, Germany, from September 22-25, 2026, for WindEnergy...
Read More
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Oct 20, 2026
Maxwell
Predictive Maintenance Market to Reach 16.74 Billion Dollars by 2031
Nine point seven one billion dollars in 2026. Sixteen point seven four billion by 2031....
Read More
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Oct 19, 2026
Maxwell
China's Lijian-1 Rocket Assembly Cycle Shortened to 15 Days
Fifteen days. That is the current final-assembly time for a Lijian-1 carrier rocket in the...
Read More
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Oct 19, 2026
Maxwell
Schneider Electric Showcases Modicon PLC Enhancements at WEFTEC 2026
Water utilities around the world are discovering that the same programmable logic controllers that run...
Read More
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
Oct 19, 2026
Maxwell
Yunji Group and Huawei Deploy Intelligent Inspection Robots on African Mine Conveyors
A conveyor belt spanning a hundred kilometers does not fail politely. In iron-ore logistics, the...
Read More
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
Oct 18, 2026
Maxwell
Embodied Intelligence Robot with Domestic Electronic Architecture Debuts in China
On September 28, 2026, a robotics company in Yichang, Hubei Province unveiled what it claims...
Read More
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
Oct 18, 2026
Maxwell
Ondas Cyberhawk Secures Multi-Year Drone Inspection Contract with SSE plc
drone-based infrastructure inspection has moved from experimental pilot projects to long-term service agreements, signaling a...
Read More
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
Oct 18, 2026
Maxwell
IFR World Robotics Report 2026 China Installs 354000 Industrial Robots
The International Federation of robotics released its 2026 World Robotics Report on September 24, and...
Read More