31000-16-05-00-100-03-02 Bently Nevada 31000 Series Proximity Probe Housing
31000-16-05-00-100-03-02 Bently Nevada 31000 Series Proximity Probe Housing
31000-16-05-00-100-03-02 Bently Nevada 31000 Series Proximity Probe Housing
Bently Nevada

31000-16-05-00-100-03-02 Bently Nevada 31000 Series Proximity Probe Housing

SKU: 31000-16-05-00-100-03-02
Categories : All Products
In Stock
  • Dimensions: 20 cm x 10 cm x 10 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for secure probe positioning in industrial machinery monitoring, the Bently Nevada 31000-16-05-00-100-03-02 (31000 Proximity Probe Housing) provides direct physical execution of probe mounting and signal protection within rotating equipment networks.

Model Suffix Breakdown

The part number defines specific mechanical and configuration parameters:

  • 31000: Proximity probe housing series

  • 16: Material and thread configuration

  • 05: Probe orientation style

  • 00: Unthreaded length variant

  • 100: Housing length (100 mm)

  • 03: Configuration option

  • 02: Interface variant

Hardware Specifications

Parameter Specification
Model 31000-16-05-00-100-03-02
Brand Bently Nevada
Origin USA
Weight 0.65 kg
Shipping Dimensions 20 cm x 10 cm x 10 cm
Operating Temp -35 deg C to +200 deg C
Power Consumption Passive mechanical component
Housing Material Stainless steel

TSI Mechanical Monitoring and Signal Integrity

The housing maintains the rigid spatial orientation required for accurate eddy-current probe scaling. Consistent rotor dynamics analysis depends on the housing's ability to prevent mechanical vibration transmission to the probe assembly itself. Proper gap voltage validation, targeting -10 VDC at the linear range center, is achieved only when the probe is locked securely within the housing. Operators must ensure cross-talk suppression by maintaining specified distances between adjacent housings, preventing electromagnetic interference from contaminating shaft displacement signals during operation.

Ordering Info

  • 1 x 31000-16-05-00-100-03-02 Proximity Probe Housing

  • 1 x Locking nut assembly

  • 1 x O-ring seal

  • 1 x Technical installation documentation

Field Installation Guidelines

  • Surface Preparation: Clean the mounting boss to ensure a flat, stable interface for the housing base.

  • Thread Engagement: Utilize thread lubricant to prevent galling; ensure a minimum of 5 full threads of engagement.

  • Locking Mechanism: Tighten the lock nut firmly once the probe gap is set to prevent mechanical drift during machine operation.

  • Grounding: Ensure the housing is properly bonded to the machine case to maintain a low-impedance path for signal shielding.

Frequently Asked Questions

  • Does the housing provide electrical isolation? No, the housing is metallic; isolation must be provided by external probe mounting hardware if required.

  • Can this housing be used in high-pressure oil environments? Yes, ensure the O-ring is installed correctly to maintain a seal against operating pressures.

  • How do I determine the correct gap? Use a feeler gauge between the probe tip and the shaft during the initial housing installation and lock-nut tightening.

  • Is the housing material compatible with corrosive atmospheres? The stainless steel construction provides high resistance to oxidation in standard industrial environments.

  • Can I adjust the probe depth after the housing is locked? No, the locking nut must be loosened to allow for probe movement; ensure the probe gap is validated after re-locking.

  • What causes signal drift in this assembly? Loose lock nuts or mechanical settling of the mounting surface can lead to gap drift and measurement errors.

  • Can this housing support armored cables? Yes, the rear thread configuration is designed to interface with standard flexible metal conduit systems.

  • Is the housing repairable? The housing is a precision-machined mechanical component and is not repairable if threads or sealing surfaces are damaged.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Continental Resources and Mercuria Launch $4B Vaca Muerta Joint Venture
Sep 06, 2026
MaxWell
Continental Resources and Mercuria Launch $4B Vaca Muerta Joint Venture
In a strategic move to capitalize on South America's premier unconventional energy play, Continental Resources...
Read More
Weidmüller Secures Guinness World Record for Terminal Connection Speed
Sep 06, 2026
MaxWell
Weidmüller Secures Guinness World Record for Terminal Connection Speed
Industrial control panel manufacturing continues to face skilled labor shortages and tight project turnaround timelines,...
Read More
Helmerich & Payne Claims Top Position in First-Quarter US Land Drilling Rankings
Sep 06, 2026
MaxWell
Helmerich & Payne Claims Top Position in First-Quarter US Land Drilling Rankings
Data analytics firm Enverus has published its US land drilling contractor and operator performance rankings...
Read More
Industrial Skills Gap: System Integrators Bridge Software and Hands-On Field Engineering
Sep 05, 2026
MaxWell
Industrial Skills Gap: System Integrators Bridge Software and Hands-On Field Engineering
 Rapid digitalization across modern manufacturing has created a pronounced talent discrepancy among incoming control system...
Read More
Bridging the Gap: Aligning Academic Research with Real-World Process Control Needs
Sep 05, 2026
MaxWell
Bridging the Gap: Aligning Academic Research with Real-World Process Control Needs
The industrial automation sector continues to grapple with a long-standing challenge: bridging theoretical academic research...
Read More
Autonomous Operations in Process Manufacturing: Reality vs Industry Hype
Sep 05, 2026
MaxWell
Autonomous Operations in Process Manufacturing: Reality vs Industry Hype
The industrial manufacturing landscape is witnessing a growing divide between discrete assembly operations and complex...
Read More
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Sep 04, 2026
MaxWell
Germany’s High-Value Pivot: Can Advanced Tech Save Its Industrial Base?
Germany’s manufacturing framework is undergoing a structural pivot, balancing macroeconomic stagnation with targeted, high-capital deployments...
Read More
Emerson Unveils DeltaV v16.LTS DCS Architecture
Sep 04, 2026
MaxWell
Emerson Unveils DeltaV v16.LTS DCS Architecture
Modern industrial operations face mounting pressure to modernize their automation infrastructure while controlling lifecycle expenditures...
Read More
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Sep 04, 2026
MaxWell
Cisco 2026 Report Highlights Industrial AI and Infrastructure Shift
Industrial facilities are rapidly evolving into the primary engines of data generation across global enterprise...
Read More
Industrial AI Scaling Depends on OT Data Readiness
Sep 03, 2026
MaxWell
Industrial AI Scaling Depends on OT Data Readiness
Industrial companies have invested heavily in automation, control systems, historians, manufacturing software and enterprise platforms...
Read More