2711P-T10C21D8S Allen-Bradley PanelView Plus 7 HMI Operator Interface
2711P-T10C21D8S Allen-Bradley PanelView Plus 7 HMI Operator Interface
2711P-T10C21D8S Allen-Bradley PanelView Plus 7 HMI Operator Interface
Allen-Bradley

2711P-T10C21D8S Allen-Bradley PanelView Plus 7 HMI Operator Interface

SKU: 2711P-T10C21D8S
Categories : All Products
In Stock
  • Dimensions: 21 x 13.5 x 4.2 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 2711P-T10C21D8S, also cataloged as the 2711P-T10C21D8S Operator Interface, operates as a dedicated hardware component for graphical process visualization and operator input command execution within EtherNet/IP and deterministic control networks.

Model Matrix & Configuration

The 2711P-T10C21D8S designates a 10.4-inch display terminal within the PanelView Plus 7 Standard series. This model utilizes a Windows CE 6.0 operating system kernel to manage application runtime environments. The "D" suffix denotes a 24 VDC nominal input power requirement, while the hardware configuration includes integrated memory allocation for localized tag processing and alarm history management.

Hardware Specifications

Parameter Specification
Model 2711P-T10C21D8S
Brand Allen-Bradley
Origin USA
Weight 0.55 kg
Shipping Dimensions 21.00 x 13.50 x 4.20 cm
Operating Temp 0 deg C to 50 deg C
Power Consumption 18-30 VDC
Display 10.4-inch TFT Color
Resolution 800 x 600 SVGA, 18-bit
User Memory 80 MB
RAM/Storage 512 MB / 512 MB

PLC Platform & Firmware Compatibility

The device integrates into ControlLogix and CompactLogix architectures via an onboard 10/100 Mbps Ethernet port. The hardware supports firmware flash compatibility, allowing for updates to runtime services to ensure alignment with Studio 5000 machine edition project files. Backplane bus communication velocity is optimized for low-latency tag updates, ensuring that operator inputs and controller register writes are synchronized according to the configured periodic task cycles.

Ordering Info

  • 2711P-T10C21D8S base operator interface unit.

  • Mounting hardware kit (clips).

  • Removable 24 VDC power terminal block.

  • User documentation and compliance certificates.

Field Installation Guidelines

  • Panel Cutout: Prepare a rectangular aperture meeting the specific dimensional tolerances for the PanelView Plus 7 chassis to ensure NEMA-rated seal integrity.

  • Grounding: Secure the protective earth (PE) terminal to a low-impedance ground bus to mitigate potential electromagnetic interference and ESD path grounding.

  • Cabling: Utilize Cat5e or Cat6 shielded twisted-pair cabling for Ethernet communication; maintain separation from high-voltage motor lead conductors to prevent signal noise.

  • Power: Confirm the DC power source provides stable 18-30 VDC; verify polarity prior to securing the connector to the HMI backplane.

  • Environment: Ensure sufficient clearance for ambient air convection behind the mounting panel to comply with operating temperature limits.

Logistics Logistics

  • Delivery time: 2-7 days when payment finish.

  • Shipment via DHL/FEDEX/UPS.

  • All units are sealed in anti-static industrial packaging to maintain component integrity.

Frequently Asked Questions

  • What is the expected service life?

    The service life is influenced by the backlight intensity settings and ambient thermal environment; the TFT component is rated for continuous industrial duty.

  • How is probe health tested?

    The touch interface health is verified via self-test routines in the configuration menu; persistent input failure suggests hardware overlay degradation.

  • Can the display operate in hazardous environments?

    Operation in hazardous locations requires the unit to be mounted within a properly rated enclosure meeting local electrical code standards.

  • What causes unstable input response?

    Unstable input response is typically attributed to physical pressure variations on the resistive overlay or electromagnetic noise coupled into the touch controller circuit.

  • How is firmware validated?

    Firmware validity is managed through a checksum verification process initiated during the ControlFlash update sequence.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More