2711-B6C2 Allen-Bradley PanelView 600 Operator Interface HMI
2711-B6C2 Allen-Bradley PanelView 600 Operator Interface HMI
2711-B6C2 Allen-Bradley PanelView 600 Operator Interface HMI
Allen-Bradley

2711-B6C2 Allen-Bradley PanelView 600 Operator Interface HMI

SKU: 2711-B6C2
Categories : All Products
In Stock
  • Dimensions: 29 x 11 x 19 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 2711-B6C2, also cataloged as the 2711B6C2 Operator Interface, serves as the primary terminal utilized to execute visualization and command functions across DH-485 network platforms. This hardware component provides a 6-inch color display integrated with both touchscreen regions and physical function keys for localized process control.

Model Identification Matrix

The 2711-B6C2 designation signifies the following configuration:

  • Display: 6-inch color terminal.

  • Input: Integrated keypad and touchscreen.

  • Communication: DH-485 communication ports.

  • Power: AC input configuration.

Hardware Specifications

Parameter Specification
Model 2711-B6C2
Brand Allen-Bradley
Origin USA
Weight 1.56 kg
Shipping Dimensions 29 cm x 11 cm x 19 cm
Operating Temp 0 deg C to 55 deg C
Power Consumption 100-240 VAC, 50/60 Hz, 75 VA

Deterministic Network Connectivity

This terminal utilizes the DH-485 protocol to maintain deterministic communication within Allen-Bradley control architectures. Firmware flash compatibility is managed via the PanelBuilder32 software suite, which requires precise alignment of the project runtime version with the terminal firmware. Operators must verify that the link parameters, including node address and baud rate, match the requirements of the DH-485 network segment to prevent packet collisions or data loss. Proper cabling and termination are mandatory to maintain signal integrity, as the DH-485 bus is sensitive to impedance mismatches and excessive electromagnetic noise in the industrial environment.

Ordering Info

  • 2711-B6C2 Operator Interface unit

  • Panel mounting clips

  • IP65/NEMA 4X rated sealing gasket

  • AC power terminal block

Installation & Mounting Guidelines

  • Panel Cutout: Prepare the cabinet cutout strictly to specifications to ensure the efficacy of the NEMA 4X/IP65 gasket seal.

  • Grounding: Secure the chassis ground terminal to a common industrial earth to protect the internal processor and display circuitry from static discharge.

  • Thermal Management: Allow a minimum clearance of 50 mm around the rear of the enclosure to promote airflow, as the internal power supply generates significant thermal dissipation.

  • Communication Routing: Route DH-485 cabling through dedicated metallic conduits to maintain signal isolation from AC power supply lines.

Delivery Information

  • Delivery time: 2-7 days when payment finish.

  • Dispatched via DHL/FEDEX/UPS.

  • Components are sealed in anti-static industrial packaging, featuring shock-absorbent layers to mitigate potential damage during global logistics.

Frequently Asked Questions

  • What display technology is utilized? The terminal incorporates a 6-inch color LCD display. It is designed to provide high-contrast visualization for process monitoring and status indications within standard industrial control cabinet environments.

  • Can project files be migrated to modern software? Migration from PanelBuilder32 applications to newer development environments is not supported via direct import. Manual conversion of graphic objects and tag assignments is required for project upgrades.

  • What is the primary communication port function? The DH-485 port facilitates data exchange with controllers and peer-to-peer communication within the DH-485 network. The secondary serial port is reserved for printer connectivity and project file downloads.

  • How is the internal real-time clock maintained? The clock and configuration memory are backed by an internal lithium battery. This battery should be replaced periodically to prevent data loss; the unit should ideally be powered during replacement to maintain volatility memory.

  • Can the touchscreen be calibrated? The touch interface includes a built-in calibration utility accessible via the configuration screen, which should be used if the screen registration drifts due to mechanical stress or aging.

  • What causes communication failures on the DH-485 link? Failures are typically caused by incorrect baud rate settings, node address collisions, or improperly terminated cabling leading to signal reflections on the bus.

  • Is the backlight serviceable? The CCFL backlight is a non-serviceable component. Gradual dimming is expected over the device's operational lifespan, and replacement of the terminal is recommended when display legibility is compromised.

  • Can the unit operate in hazardous environments? Operation in hazardous locations is only permitted if the unit is housed in an approved enclosure meeting the specific safety requirements and ingress ratings for the designated site.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Goldwind Launches Clean Energy Smart Operation Overall Solution
Oct 04, 2026
Maxwell
Goldwind Launches Clean Energy Smart Operation Overall Solution
Goldwind Technology, one of the world's leading wind turbine manufacturers, has unveiled its comprehensive clean...
Read More
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Oct 04, 2026
Maxwell
Tianze Zhilian Releases Wind Farm Safety AI Solution with Mobile Intelligent Inspection
Chinese technology company Tianze Zhilian has launched a comprehensive artificial intelligence solution for wind farm...
Read More
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Oct 03, 2026
Maxwell
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions
Cadeler and Vattenfall Partner on Offshore Wind Maintenance Solutions Offshore wind installation specialist Cadeler and...
Read More
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Oct 03, 2026
Maxwell
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology
Huaneng New Energy Patents Intelligent Robot Safety Collaborative Control Technology China's push toward autonomous operations...
Read More
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
Oct 02, 2026
Maxwell
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026
COPA-DATA Showcases Unified Wind Farm SCADA at WindEnergy Hamburg 2026 Austrian automation software provider COPA-DATA...
Read More
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Oct 02, 2026
Maxwell
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China
Yangjiang Offshore Wind Power Installed Capacity Exceeds 8GW Ranking First in China China's offshore wind...
Read More
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
Oct 01, 2026
Maxwell
2026 World Manufacturing Conference Concludes in Hefei with 1200 Exhibitors
The 2026 World Manufacturing Conference, one of China's premier industrial technology showcases, concluded on September...
Read More
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
Oct 01, 2026
Maxwell
Dongfeng Motor Humanoid Robot Xiao Dong to Enter Factory Trial Production in October
China's state-owned automotive giant is preparing to deploy its homegrown humanoid robot on the factory...
Read More
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
Sep 30, 2026
Maxwell
Wind Turbine Prices Stabilize as Industry Profit Inflection Point Approaches
After years of relentless price erosion that has squeezed margins across the wind energy supply...
Read More
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
Sep 30, 2026
Maxwell
Chengdu Launches Embodied Intelligence Pilot Base for Automotive Manufacturing
The convergence of embodied intelligence and automotive manufacturing took a significant step forward on September...
Read More