2094-AM01 Allen-Bradley Kinetix 6000 Axis Module
2094-AM01 Allen-Bradley Kinetix 6000 Axis Module
Allen-Bradley

2094-AM01 Allen-Bradley Kinetix 6000 Axis Module

SKU: 2094-AM01
Categories : All Products
In Stock
  • Dimensions: 7.6 x 22.9 x 17.8 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

Configured for multi-axis motion control in automated platforms, the Allen-Bradley 2094-AM01 (2094-AM01 Axis Module) provides direct physical/electrical execution. This Kinetix 6000 series inverter module operates on a 200/230 VAC input to deliver 1.9 kW of power at 9 A output. The module functions as a drive axis within the integrated Kinetix 6000 motion control system, facilitating high-speed motor commutation without the safe torque-off (STO) feature.

Hardware Specifications

Parameter Specification
Model 2094-AM01
Brand Allen-Bradley
Origin USA
Weight 1.5 kg
Shipping Dimensions 7.6 cm x 22.9 cm x 17.8 cm
Voltage Rating 200/230 VAC
Output Power 1.9 kW
Current Output 9 A

Control Network Communication

The 2094-AM01 is designed to operate within the Kinetix 6000 power rail, utilizing the internal backplane bus to maintain high-speed communication with the axis control module. The drive firmware supports deterministic feedback loops, ensuring accurate position and velocity tracking. Firmware flash compatibility is supported, allowing for updates to motion control parameters. Users must ensure that I/O density scaling on the host controller is properly configured to support the specific current rating of this 9 A inverter module within the drive train.

Ordering Info

  • 1 2094-AM01 Axis Module

  • 1 Installation and maintenance documentation set

Field Installation Guidelines

  • Mounting

    • Mount the axis module onto the Kinetix 6000 power rail, ensuring the power and signal connectors are fully seated.

    • Secure the module using the integrated captive screws to ensure a proper chassis ground connection.

  • Wiring

    • Connect the motor power leads and feedback cables to the designated front-facing terminals.

    • Route motor power cables away from signal and feedback cabling to prevent induced noise and potential commutation errors.

    • Verify that the input voltage matches the 200/230 VAC rating before energizing the bus.

Frequently Asked Questions

  • Does this module include safe torque-off (STO)?

    No, the 2094-AM01 does not include the STO feature; appropriate external hardware must be used for safety-rated stop requirements.

  • Is the 2094-AM01 hot-swappable?

    No, this module must be removed and installed only when the system power is completely de-energized to prevent electrical damage to the power rail connectors.

  • What happens if the module is installed on an incompatible rail?

    Mechanical keys and electrical interlocks are designed to prevent the module from mating with incompatible rail segments; do not force the installation.

  • How is the module status monitored?

    Status is indicated by the LEDs on the faceplate, which provide diagnostics for communication status, fault conditions, and power presence.

  • Can this module be used with different Kinetix series?

    No, the 2094-AM01 is specifically engineered for the Kinetix 6000 multi-axis system and is not cross-compatible with Kinetix 5000 or 7000 series drives.

  • What is the required bus voltage?

    The module requires a 200/230 VAC input from the shared power bus; verify the bus supply capacity meets the total load requirements of all installed axes.

  • How are firmware updates managed?

    Firmware is managed via the motion control software through the communication interface of the Kinetix 6000 axis control module.

  • What is the consequence of failing to tighten mounting screws?

    Poor mechanical contact will prevent the module from achieving a proper ground connection, leading to intermittent communication faults and increased electromagnetic interference.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
Sep 01, 2026
MaxWell
OMRON Robotics Unveils Next-Gen AMRs for High-Payload Intralogistics
OMRON Robotics is showcasing its latest mobile industrial automation advancements at Automate 2026 in Chicago,...
Read More
Frontieras Taps Yokogawa for $850M West Virginia Processing Plant Automation
Sep 01, 2026
MaxWell
Frontieras Taps Yokogawa for $850M West Virginia Processing Plant Automation
Frontieras North America has selected Yokogawa Corporation of America as the Main Automation Contractor (MAC)...
Read More
Yokogawa Secures MAC Contract for $13B Commonwealth LNG Facility
Sep 01, 2026
MaxWell
Yokogawa Secures MAC Contract for $13B Commonwealth LNG Facility
Yokogawa Corporation of America has been selected as the Main Automation Contractor (MAC) for the...
Read More
Baker Hughes Secures $7.1 Billion Record Orders Driven by Industrial Power Demand
Aug 31, 2026
MaxWell
Baker Hughes Secures $7.1 Billion Record Orders Driven by Industrial Power Demand
Energy technology provider Baker Hughes posted second-quarter revenues of $6.74 billion, navigating strategic divestitures while...
Read More
Mitsubishi Electric Consolidates North American Operations Under US Division Strategic Restructure
Aug 31, 2026
MaxWell
Mitsubishi Electric Consolidates North American Operations Under US Division Strategic Restructure
Mitsubishi Electric US, Inc. (MEUS) has initiated a structural consolidation of its United States enterprise...
Read More
Finnvera Secures Up to $132M Export Credit Financing Support for Troilus Copper-Gold Mine Development
Aug 31, 2026
MaxWell
Finnvera Secures Up to $132M Export Credit Financing Support for Troilus Copper-Gold Mine Develop...
Troilus Mining has secured non-binding support for up to $132 million in export credit support from Finland's...
Read More
First Mining Reaches Development Deal With Ontario First Nations
Aug 30, 2026
MaxWell
First Mining Reaches Development Deal With Ontario First Nations
Cat Lake First Nation (CLFN), Lac Seul First Nation (LSFN) and First Mining Gold have...
Read More
Cabral Gold Uncovers High-Grade Extension at Cuiú Cuiú Ahead of September Initial Pour
Aug 30, 2026
MaxWell
Cabral Gold Uncovers High-Grade Extension at Cuiú Cuiú Ahead of September Initial Pour
Cabral Gold has identified a promising new mineralized strike at its Cuiú Cuiú project in northern Brazil, expanding...
Read More
Boliden Expands in Latin America With $1.3B Nexa Deal
Aug 30, 2026
MaxWell
Boliden Expands in Latin America With $1.3B Nexa Deal
Swedish mining group Boliden has agreed to acquire Votorantim’s 65% controlling stake in Nexa Resources...
Read More
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
Aug 29, 2026
Maxwell PLC Ltd
Sandvik Unveils xCell Digital Ground Support Monitoring Infrastructure
At the ACG Caving Conference 2026 in Ulaanbaatar, mining technology developer Sandvik formally introduced xCell...
Read More