1MRB178009R0002 500PBIO01-TTL ABB Control Board RTU500
ABB

1MRB178009R0002 500PBIO01-TTL ABB Control Board RTU500

SKU: 1MRB178009R0002
Categories : ABB
In Stock
  • Dimensions: 27.1 x 12 x 2.2 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 1MRB178009R0002, also cataloged as the 500PBIO01-TTL Control board, operates as a dedicated hardware component for peripheral I/O bus management within RTU500 Series platforms. The module provides direct electrical interface execution, coordinating data transfer across high-density transistor-transistor logic (TTL) expansion blocks and mapping local signals to the centralized processor module.

Technical Parameters

Parameter Specification
Model 1MRB178009R0002 500PBIO01-TTL
Brand ABB
Origin Sweden
Weight 0.32 kg
Shipping Dimensions 27.1 x 12 x 2.2 cm
Operating Temp -25 to +60 deg C
Humidity Less than or equal to 95% non-condensing
Power Supply 24 VDC
Power Consumption Less than 3 W
Module Capacity Supports up to 64 modules
Tariff Code 8537101190

Deterministic Subsystem Configuration

Designed for integration into synchronized electrical substation environments, this assembly addresses up to 64 sub-modules on a single logic cluster. The unit requires strict adherence to firmware flash compatibility profiles to maintain proper registration across the remote terminal architecture. Data transitions are clocked through backplane bus communication velocity channels, guaranteeing stable scan intervals across all connected nodes. This high-capacity architecture provides flexible I/O density scaling options, isolating internal processing registers from propagation delays caused by expanded peripheral network topologies.

Logistics Packaging Checklist

  • 1 x ABB 1MRB178009R0002 500PBIO01-TTL Control Board

  • 1 x Factory ESD Test Verification Certificate

On-Site Deployment Protocol

  • Static Discharge Containment: Field engineers must maintain connection to a verified earth grounding point using a standard ESD wrist strap before handling the circuit board assembly. Do not touch bare trace corridors or IC pins.

  • Slot Configuration Limits: Verify that the subrack alignment pins match the receiving backplane slot before applying physical pressure. Ensure the lock levers engage fully to establish clean low-resistance contact with the 24 VDC power bus rails.

  • TTL Conductor Routings: All low-voltage TTL connection lines must be kept short and segregated from high-power alternating current paths to avoid inductive noise injection into the peripheral bus.

Dispatch and Shipping Criteria

  • Fulfillment Turnaround: Shipments are processed and scheduled for dispatch within 3-5 days when payment finish protocols conclude.

  • Transit Vehicle: Consignments are forwarded worldwide via express freight providers (DHL, FEDEX, or UPS).

  • Defensive Cushioning: Every card is enclosed in heavy-duty anti-static industrial packaging and padded with dense, non-conductive shock isolation foam to resist mechanical impacts during long-distance handling.

Technical Engineering FAQ

Q: Is this control board engineered to support hot-swapping routines under live bus loads?

A: No. The board features standard non-staggered edge pin connections. Removing or inserting the module while the 24 VDC backplane bus is energized will generate voltage transients that can corrupt logic registers on the host processor and disrupt communication to adjacent expansion modules.

Q: What are the functional outcomes of a firmware flash compatibility variance on this unit?

A: A firmware version mismatch prevents the controller from scanning the peripheral rack. The module status indicator will switch to a permanent error code, and the device will fail to discover or map any of the maximum 64 supported expansion blocks.

Q: How is the low power consumption profile maintained under full expansion loads?

A: The board utilizes localized low-power logic gates that require less than 3 W for independent operations. Power distribution to downstream TTL components is handled through dedicated expansion rails, keeping the thermal profile of the primary control board stable across the entire -25 to +60 deg C operational window.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More