1KHL178013R0001M BIO01 ABB BIO01 Drive I/O Board
ABB

1KHL178013R0001M BIO01 ABB BIO01 Drive I/O Board

SKU: 1KHL178013R0001M
Categories : ABB
In Stock
  • Dimensions: 20 x 10.5 x 5.5 cm
  • Country of origin: Sweden
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The ABB 1KHL178013R0001M, also cataloged as the BIO01 Drive I/O Board, operates as a dedicated hardware component for mixed-signal interface processing and localized speed feedback acquisition within industrial drive systems. Configured for high-speed signal tracking, the module reads 0-10 V or 4-20 mA analog feedback loops and processes optically decoupled 24 VDC digital states while driving differential encoder measurement channels.

Hardware Specifications

Parameter Specification
Model 1KHL178013R0001M BIO01 (Spare Part: BIO01)
Brand ABB
Origin SWEDEN
Weight 0.44 kg
Shipping Dimensions 20 x 10.5 x 5.5 cm
Operating Temp -10 to +50 deg C (derating required above +40 deg C)
Storage Temp -40 to +85 deg C
Humidity 5% to 95% RH (non-condensing)
Operating Voltage 24 VDC (+/- 10%)
Power Consumption Less than or equal to 5 W
Isolation Voltage 1500 VAC
Digital Inputs 24 VDC level
Analog Inputs 0-10 V or 4-20 mA channels
Signal Latency Less than 1 ms (digital I/O paths)
Analog Accuracy +/- 0.1% FSR (Full Scale Range)
Encoder Supply 5 VDC +/- 5%, 500 mA maximum load
Environmental Noise Immunity Greater than 1500 V/m
Tariff Code 8537101190

Deterministic Sync and I/O Density Scaling

The drive board utilizes dedicated hardware registers to synchronize physical signal transitions directly with the system control core. It implements precise time-stamping mechanisms that interface over native backplane bus communication velocity channels, minimizing signal propagation variance under heavy transient conditions. The architecture enforces pre-calibrated firmware flash compatibility profiles to enable immediate node mapping without processing delays. This direct execution path handles local digital filtering and speed calculations, providing repeatable I/O density scaling options across the multi-axis drive framework without straining centralized processing loops.

Field Installation Guidelines

  • Static Charge Dissipation: Technicians must wear an approved, grounded ESD wrist strap before handling the circuit card assembly. Do not contact any exposed components or conductive traces near the encoder interface pins.

  • Thermal Management Mounting: Secure the assembly vertically onto the standard subrack guide rails. For applications operating above +40 deg C, implement forced air ventilation to comply with the continuous thermal derating schedule up to the +50 deg C operating ceiling.

  • Conductor Separation and Grounding: Route the high-impedance 0-10 V / 4-20 mA analog input pairs through dedicated, shielded twisted cabling separated from high-current motor cables. The encoder signal screen must be bonded to the low-impedance chassis grounding bar using conductive cable clamps to suppress high-frequency noise interference.

Frequently Asked Questions

Q: Is hot-swapping supported for the 1KHL178013R0001M BIO01 card during active drive operations?

A: No. The board interface does not contain sequenced trace lengths or isolated pre-charge paths. Removing or inserting the module while the backplane 24 VDC bus is active will induce current spikes that can disrupt concurrent bus transactions or damage the 5 VDC encoder supply circuit.

Q: What are the consequences of a firmware flash compatibility version mismatch?

A: If the firmware version embedded on the board does not match the version designated by the drive host controller, the system will prevent synchronization. The digital I/O latency will default to a locked fault state, disabling the 5 VDC encoder supply output as a safety measure.

Q: How does the module handle high electrical noise environments common to drive cabinets?

A: The board features integrated structural shielding and optical isolation rated up to 1500 VAC, complemented by an environmental noise immunity rating of greater than 1500 V/m. This limits high-frequency transient injection from entering the internal logic registers.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Assembly
Oct 15, 2026
Maxwell
Future Astronaut Xiongan Smart Manufacturing Base Officially Opens with Fengxing-1 Spacecraft Ass...
On September 29, 2026, the Future Astronaut Xiongan Smart Manufacturing Base officially commenced operations in...
Read More
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
Oct 15, 2026
Maxwell
2026 World Manufacturing Conference Signs 790 Projects Worth 363.4 Billion Yuan
The 2026 World Manufacturing Conference, held September 20-23 in Hefei, Anhui Province, concluded with an...
Read More
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Oct 14, 2026
Maxwell
Hubei Kaishan Heavy Industry Mining Robots Delivered Nearly 30 Units This Year
Hubei Kaishan Heavy Industry has delivered nearly 30 mining robots in the first nine months...
Read More
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
Oct 14, 2026
Maxwell
2026 Industrial Machine Tool Industry Chain High-Quality Development Conference Held in Wuzhen
The 2026 Industrial Machine Tool Industry Chain High-Quality Development Conference opened September 29 in Wuzhen,...
Read More
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
Oct 14, 2026
Maxwell
CITIC Heavy Industries Deploys AI-Powered Roll Surface Monitoring System for Mining Equipment
CITIC Heavy Industries has deployed an AI-powered roll surface monitoring system at Luoyang Molybdenum's mining...
Read More
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
Oct 13, 2026
Maxwell
Qinghai 1GW PV CSP Hybrid Project Successfully Connected to Grid
On October 1, 2026, China's renewable energy sector reached another milestone as the Qinghai Gonghe...
Read More
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
Oct 13, 2026
Maxwell
AUTOMA 2026 Oil Gas Automation and Digitalisation Congress Opens October 5-6 Amsterdam
When the global oil and gas industry gathers in Amsterdam next week for AUTOMA 2026,...
Read More
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
Oct 12, 2026
Maxwell
Liancheng Technology to Showcase Full-Stack Domestic Alternative at CIIF 2026
When the 26th China International Industry Fair opens its doors in Shanghai on October 12,...
Read More
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
Oct 12, 2026
Maxwell
China's First Domestic Variable-Speed Pumped Storage Unit Main Body Installation Completed
On October 1, 2026, China achieved a significant breakthrough in energy storage technology as the...
Read More
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
Oct 12, 2026
Maxwell
2026 PLC DCS Deep Dive Domestic Medium-Large PLC Market Share Breaks 35 Percent
The numbers from China's industrial automation market in 2026 tell a story of fundamental transformation....
Read More