1757-FFLD2 Allen-Bradley ControlLogix Fieldbus Linking Module
Allen-Bradley

1757-FFLD2 Allen-Bradley ControlLogix Fieldbus Linking Module

SKU: 1757-FFLD2
Categories : All Products
In Stock
  • Dimensions: 19.1 x 12.7 x 8.9 cm
  • Country of origin: USA
  • Payment: T/T, Western Union
  • Shipping port: Xiamen
1 years warranty
Delivery time: 3-7 business days
Free 30 days return

Help

If you have any questions, you are always welcome to contact us. We'll get back to you as soon as possible, withing 24 hours on weekdays.

Customer service

All questions about your order, return and delivery must be sent to our customer service team by e-mail at yourstore@yourdomain.com

Sale & Press

If you are interested in selling our products, need more information about our brand or wish to make a collaboration, please contact us at press@yourdomain.com

The Allen-Bradley 1757-FFLD2, also cataloged as the 1757-FFLD2 Fieldbus Linking Module, operates as a dedicated hardware component for bridging FOUNDATION Fieldbus H1 networks to high-speed Ethernet backbones within ControlLogix system architectures.

Product Variants & Identification

The Allen-Bradley 1757-FFLD2 bridges fieldbus device segments directly to higher-level automation networks. Spare catalog representations include the 1757FFLD2 and revision designation 1757-FFLD2/A. The module integrates up to four H1 FOUNDATION Fieldbus channels and a single 10/100 Mbps Ethernet connection to process process-level field data.

Electrical & Operational Specifications

Parameter Specification
Model 1757-FFLD2
Brand Allen-Bradley
Origin USA
Weight 0.8 kg
Shipping Dimensions 19.1 x 12.7 x 8.9 cm
Operating Temp 0 to 60 deg C
Nonoperating Temp -40 to 85 deg C
Power Consumption 7.2 W (300 mA at 24 VDC nominal, 1.5 A max)
Physical Interfaces 2 or 4 H1 FOUNDATION Fieldbus, 1 10/100 Ethernet RJ45
Max Devices Per H1 16 (8 to 10 recommended)
Max Devices Per Module 64
Humidity 5% to 95% noncondensing
Tariff Code 8537101190

Deterministic Network Bridging & Firmware Execution

The module manages data translation between FOUNDATION Fieldbus H1 field devices and EtherNet/IP deterministic networks without introducing system latency. Firmware flash compatibility allows remote updating of protocol stacks over the Ethernet interface. Optimized memory mapping maintains high-speed backplane bus communication velocity when transferring fieldbus blocks to the main controller image, while flexible configuration scaling accommodates up to 64 field instruments per linking module.

Delivery Package Contents

  • 1 x 1757-FFLD2 Fieldbus Linking Module
  • 1 x Protective Static Shielding Bag
  • 1 x Terminal Connector Block Kit

Hardware Mounting & Wiring Rules

  • Disconnect input power sources before handling or mounting the module to prevent electrical shock or equipment damage.
  • Mount the module securely onto standard DIN rail or chassis infrastructure inside a protected control enclosure.
  • Terminate H1 fieldbus segments using approved shielded twisted-pair cables with 100-ohm line terminators at both ends of the trunk.
  • Connect low-impedance ground bonding wires directly from the shield terminal to the central enclosure earth ground bus.
  • Route Ethernet lines and low-voltage fieldbus signal leads away from high-voltage motor circuits and variable frequency drives.

Technical FAQ

  • What supply voltage and current does the 1757-FFLD2 require?

    The module operates on 24 VDC power, drawing a nominal current of 300 mA under standard operation and a maximum current of 1.5 A.

  • How many FOUNDATION Fieldbus devices can connect to a single H1 channel?

    Each H1 physical interface supports up to 16 fieldbus devices, though 8 to 10 devices per segment are recommended for optimal scan times.

  • What is the total device capacity for one 1757-FFLD2 module?

    The module can aggregate and manage data from a maximum of 64 FOUNDATION Fieldbus devices across all integrated H1 channels.

  • What network interface provides communication to the ControlLogix system?

    Primary connectivity to the supervisory system is provided via a standard 10/100 Mbps RJ45 Ethernet port.

  • How are fieldbus cable shields properly grounded on this module?

    Cable shields should be connected to the dedicated ground terminal and bonded to earth at a single point to prevent ground loop noise.

  • What thermal limits must be observed during module operation?

    The unit is specified for continuous operation within ambient temperature limits ranging from 0 deg C up to 60 deg C.

  • Can the firmware on the 1757-FFLD2 be upgraded in the field?

    Yes, firmware flash compatibility permits field updates over the local Ethernet communication port using standard configuration tools.

  • What relative humidity conditions are acceptable for operation?

    The module operates in relative humidity environments ranging from 5% to 95%, provided the air remains noncondensing.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Shipping & Returns

Shipping

  • Emergency Dispatch: Same-day shipping for in-stock orders placed before 2:00 PM (GMT+8).
  • Premium Carriers: Reliable global delivery via DHL, FedEx, and UPS to 150+ countries.
  • Flexible Options: We support shipping via your own carrier account (DHL/FedEx/UPS).
  • Industrial Packaging: Professional ESD protection and reinforced shock-absorbent packaging.

Returns

  • 30-Day Window: Request a return within 30 days of receipt for eligible items.
  • Condition: Items must be in their original, factory-sealed condition with all tags.
  • Hassle-Free Process: Contact sales@maxwellplc.com for a return label and instructions.
  • Fast Refunds: Approved refunds are processed to your original payment method within 10 days.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Warranty

Warranty

  • 12-Month Guarantee: A comprehensive one-year warranty covers all functional defects.
  • Authenticity: Every part is guaranteed 100% original, brand-new, and genuine.
  • Expert Support: Dedicated technical assistance to verify and resolve any hardware issues.
  • Peace of Mind: Long-term reliability support for all your mission-critical automation parts.

Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


Secure Payment

Secure Payment

  • Flexible T/T: 100% T/T for stock items; 30% deposit / 70% balance for lead-time orders.
  • Local Friendly: RMB transfers are accepted if you have a local agent in China.
  • Best Price: Our Best Price Guarantee ensures you get the most competitive market rates.
  • Data Safety: All transactions are processed through encrypted and secure banking channels.


You may also like

From our blog

Latest News and Insights

Wind Turbine Tower Safety Monitoring Standard Takes Effect
Oct 08, 2026
Maxwell
Wind Turbine Tower Safety Monitoring Standard Takes Effect
Wind Turbine Tower Safety Monitoring Standard Takes Effect A new national standard for wind turbine...
Read More
Domestic Wind Turbine Installation Robot Achieves Commercial Application
Oct 08, 2026
Maxwell
Domestic Wind Turbine Installation Robot Achieves Commercial Application
Domestic Wind Turbine Installation Robot Achieves Commercial Application A significant milestone in wind energy operations...
Read More
TotalEnergies Partners with Mistral on Oil and Gas AI
Oct 08, 2026
Maxwell
TotalEnergies Partners with Mistral on Oil and Gas AI
TotalEnergies Partners with Mistral on Oil and Gas AI TotalEnergies has announced a strategic three-year...
Read More
XJ Electric Offshore Wind HVDC Patent Granted
Oct 07, 2026
Maxwell
XJ Electric Offshore Wind HVDC Patent Granted
XJ Electric Offshore Wind HVDC Patent Granted XJ Electric Co., Ltd. and XJ Group have...
Read More
Grid-Forming Technology Scales from Demonstration to Commercial Deployment
Oct 07, 2026
Maxwell
Grid-Forming Technology Scales from Demonstration to Commercial Deployment
Grid-Forming Technology Scales from Demonstration to Commercial Deployment The 2026 Grid-Forming Technology and Equipment Innovation...
Read More
2026 World Manufacturing Conference Showcases Smart Manufacturing Achievements
Oct 07, 2026
Maxwell
2026 World Manufacturing Conference Showcases Smart Manufacturing Achievements
2026 World Manufacturing Conference Showcases Smart Manufacturing Achievements The 2026 World Manufacturing Conference concluded in...
Read More
Lingyang Industrial Large Model 3.5 Released with Three AI Agents
Oct 07, 2026
Maxwell
Lingyang Industrial Large Model 3.5 Released with Three AI Agents
Lingyang Industrial Large Model 3.5 Released with Three AI Agents At the 2026 World Manufacturing...
Read More
Gastops and Vestas Renew MetalSCAN Oil Debris Monitoring Agreement
Oct 06, 2026
Maxwell
Gastops and Vestas Renew MetalSCAN Oil Debris Monitoring Agreement
Gearbox failures on wind turbines announce themselves long before they happen — in the metal...
Read More
XCMG Breaks Ground on Indonesia Mining Equipment Remanufacturing Center
Oct 06, 2026
Maxwell
XCMG Breaks Ground on Indonesia Mining Equipment Remanufacturing Center
On September 16, 2026, in Balikpapan on the island of Borneo, a Chinese construction machinery...
Read More
ABB Infinitus DC Power Portfolio Redesigns AI Data Center Energy Infrastructure
Oct 06, 2026
Maxwell
ABB Infinitus DC Power Portfolio Redesigns AI Data Center Energy Infrastructure
The power architecture behind artificial intelligence is quietly becoming the bottleneck that determines which data...
Read More